GDES invierte 1 millón de euros para la contratación de personal en la recarga de Almaraz I
Grupo Dominguis Energy Services
GDES Wind consolidates its position in the Spanish wind blade repair market with the opening of a new facility in Albacete. This new warehouse, with a surface area of 1200 m² and equipped with two 10-tonne overhead cranes, also has 800m2 of workshop space and a connection to the A-31 motorway.
For the fourth consecutive year, GDES REVANTI reinforces its commitment to safety by participating in the ‘Safety day’ at ITER.
ITER, the largest nuclear fusion project in the world, celebrated this day on 14th September as part of an action for the active commitment of all workers and collaborators of its facilities. Safety is a priority at ITER, which organised a full programme of interactive workshops, simulators, discussions and demonstrations, with the active participation of a delegation from GDES Revanti, our specialised surface treatment and special coatings unit, led by its director in France, Patrice Guerra.
The stand, which dealt with the subject of noise on construction sites, its risks and consequences, was very well received by all the attendees and was specifically designed by colleagues from our QHSE (Quality, Health, Safety and Environment) area.