{"id":4627,"date":"2012-10-11T12:04:12","date_gmt":"2012-10-11T11:04:12","guid":{"rendered":"https:\/\/gdes.com\/corporate\/?p=4627"},"modified":"2019-05-03T08:17:58","modified_gmt":"2019-05-03T07:17:58","slug":"concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea","status":"publish","type":"post","link":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/","title":{"rendered":"Cleaning and decontamination work for the European Commission successfully completed"},"content":{"rendered":"<p>The cleaning and decontamination work carried out for the European Commission at the Joint Research Centre (JRC) in Ispra, Italy, concluded in August with the delivery of the final report. According to Lainsa\u2019s Director for Europe and Asia, Jos\u00e9 Tom\u00e1s Ruiz Mart\u00ednez, \u201cthe objectives were all met, both in terms of quality and service efficiency, and the client is very satisfied, because for them this is a new way of conducting the work, with safety and efficiency\u201d.<\/p>\n<p><!--more--><\/p>\n<p>The work consisted in the design and implementation of a system to transfer radioactive sludge from one tank to another in Area 52 and ensure a safe, leak-free transfer using fundamental principles of physics. A triple-barrier transfer system was used and the tank was then decontaminated using a technique designed to minimize the creation of secondary waste. In this way, tank L1, which stored the sludge, has been decontaminated at its old location and awaits a decision from JRC on its future.<\/p>\n<p>This project represented a milestone for Lainsa, firstly because it involved winning our first international tender for the European Commission, in which ten companies from several countries competed. It also involved integrating the operations engineering on site, as well as drawing up the procedures.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Espa\u00f1ol.<\/p>\n","protected":false},"author":3,"featured_media":4628,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[81,78,79],"tags":[],"class_list":["post-4627","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-decommissioning","category-servicios-nucleares","category-operations-et-maintenance"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"The cleaning and decontamination work carried out for the European Commission at the Joint Research Centre (JRC) in Ispra, Italy, concluded in August with the delivery of the final report. According to Lainsa\u2019s Director for Europe and Asia, Jos\u00e9 Tom\u00e1s Ruiz Mart\u00ednez, \u201cthe objectives were all met, both in terms of quality and service efficiency,\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Lucia Gomez\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"GDES Corporate - Grupo Dominguis Energy Services -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Cleaning and decontamination work for the European Commission successfully completed - GDES Corporate\" \/>\n\t\t<meta property=\"og:description\" content=\"The cleaning and decontamination work carried out for the European Commission at the Joint Research Centre (JRC) in Ispra, Italy, concluded in August with the delivery of the final report. According to Lainsa\u2019s Director for Europe and Asia, Jos\u00e9 Tom\u00e1s Ruiz Mart\u00ednez, \u201cthe objectives were all met, both in terms of quality and service efficiency,\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2019\/02\/ispra.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2019\/02\/ispra.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"200\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2012-10-11T11:04:12+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2019-05-03T07:17:58+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@GDES_news\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Cleaning and decontamination work for the European Commission successfully completed - GDES Corporate\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The cleaning and decontamination work carried out for the European Commission at the Joint Research Centre (JRC) in Ispra, Italy, concluded in August with the delivery of the final report. According to Lainsa\u2019s Director for Europe and Asia, Jos\u00e9 Tom\u00e1s Ruiz Mart\u00ednez, \u201cthe objectives were all met, both in terms of quality and service efficiency,\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@GDES_news\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2019\/02\/ispra.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2012\\\/10\\\/11\\\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\\\/#blogposting\",\"name\":\"Cleaning and decontamination work for the European Commission successfully completed - GDES Corporate\",\"headline\":\"Cleaning and decontamination work for the European Commission successfully completed\",\"author\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/author\\\/comesp\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/wp-content\\\/uploads\\\/sites\\\/5\\\/2019\\\/02\\\/ispra.jpg\",\"width\":200,\"height\":200},\"datePublished\":\"2012-10-11T12:04:12+01:00\",\"dateModified\":\"2019-05-03T08:17:58+01:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2012\\\/10\\\/11\\\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2012\\\/10\\\/11\\\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\\\/#webpage\"},\"articleSection\":\"Decommissioning, Nuclear Services, O&amp;M Support\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2012\\\/10\\\/11\\\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en#listItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/category\\\/operativa\\\/#listItem\",\"name\":\"Operative\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/category\\\/operativa\\\/#listItem\",\"position\":2,\"name\":\"Operative\",\"item\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/category\\\/operativa\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/category\\\/operativa\\\/servicios-nucleares\\\/#listItem\",\"name\":\"Nuclear Services\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en#listItem\",\"name\":\"Inicio\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/category\\\/operativa\\\/servicios-nucleares\\\/#listItem\",\"position\":3,\"name\":\"Nuclear Services\",\"item\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/category\\\/operativa\\\/servicios-nucleares\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/category\\\/operativa\\\/servicios-nucleares\\\/operations-et-maintenance\\\/#listItem\",\"name\":\"O&amp;M Support\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/category\\\/operativa\\\/#listItem\",\"name\":\"Operative\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/category\\\/operativa\\\/servicios-nucleares\\\/operations-et-maintenance\\\/#listItem\",\"position\":4,\"name\":\"O&amp;M Support\",\"item\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/category\\\/operativa\\\/servicios-nucleares\\\/operations-et-maintenance\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2012\\\/10\\\/11\\\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\\\/#listItem\",\"name\":\"Cleaning and decontamination work for the European Commission successfully completed\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/category\\\/operativa\\\/servicios-nucleares\\\/#listItem\",\"name\":\"Nuclear Services\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2012\\\/10\\\/11\\\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\\\/#listItem\",\"position\":5,\"name\":\"Cleaning and decontamination work for the European Commission successfully completed\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/category\\\/operativa\\\/servicios-nucleares\\\/operations-et-maintenance\\\/#listItem\",\"name\":\"O&amp;M Support\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/#organization\",\"name\":\"GDES\",\"description\":\"Grupo Dominguis Energy Services\",\"url\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/\",\"telephone\":\"+34963540300\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/wp-content\\\/uploads\\\/sites\\\/5\\\/2016\\\/08\\\/cropped-GDES-1.png\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2012\\\/10\\\/11\\\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\\\/#organizationLogo\",\"width\":115,\"height\":39},\"image\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2012\\\/10\\\/11\\\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/GDES_news\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/gdes-grupo-dominguis-energy-services\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/author\\\/comesp\\\/#author\",\"url\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/author\\\/comesp\\\/\",\"name\":\"Lucia Gomez\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2012\\\/10\\\/11\\\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\\\/#webpage\",\"url\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2012\\\/10\\\/11\\\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\\\/\",\"name\":\"Cleaning and decontamination work for the European Commission successfully completed - GDES Corporate\",\"description\":\"The cleaning and decontamination work carried out for the European Commission at the Joint Research Centre (JRC) in Ispra, Italy, concluded in August with the delivery of the final report. According to Lainsa\\u2019s Director for Europe and Asia, Jos\\u00e9 Tom\\u00e1s Ruiz Mart\\u00ednez, \\u201cthe objectives were all met, both in terms of quality and service efficiency,\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2012\\\/10\\\/11\\\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/author\\\/comesp\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/author\\\/comesp\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/wp-content\\\/uploads\\\/sites\\\/5\\\/2019\\\/02\\\/ispra.jpg\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2012\\\/10\\\/11\\\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\\\/#mainImage\",\"width\":200,\"height\":200},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2012\\\/10\\\/11\\\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\\\/#mainImage\"},\"datePublished\":\"2012-10-11T12:04:12+01:00\",\"dateModified\":\"2019-05-03T08:17:58+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/\",\"name\":\"GDES Corporate\",\"description\":\"Grupo Dominguis Energy Services\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Cleaning and decontamination work for the European Commission successfully completed - GDES Corporate","description":"The cleaning and decontamination work carried out for the European Commission at the Joint Research Centre (JRC) in Ispra, Italy, concluded in August with the delivery of the final report. According to Lainsa\u2019s Director for Europe and Asia, Jos\u00e9 Tom\u00e1s Ruiz Mart\u00ednez, \u201cthe objectives were all met, both in terms of quality and service efficiency,","canonical_url":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/#blogposting","name":"Cleaning and decontamination work for the European Commission successfully completed - GDES Corporate","headline":"Cleaning and decontamination work for the European Commission successfully completed","author":{"@id":"https:\/\/gdes.com\/corporate\/en\/blog\/author\/comesp\/#author"},"publisher":{"@id":"https:\/\/gdes.com\/corporate\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2019\/02\/ispra.jpg","width":200,"height":200},"datePublished":"2012-10-11T12:04:12+01:00","dateModified":"2019-05-03T08:17:58+01:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/#webpage"},"isPartOf":{"@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/#webpage"},"articleSection":"Decommissioning, Nuclear Services, O&amp;M Support"},{"@type":"BreadcrumbList","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en#listItem","position":1,"name":"Inicio","item":"https:\/\/gdes.com\/corporate\/en","nextItem":{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/#listItem","name":"Operative"}},{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/#listItem","position":2,"name":"Operative","item":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/","nextItem":{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/servicios-nucleares\/#listItem","name":"Nuclear Services"},"previousItem":{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en#listItem","name":"Inicio"}},{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/servicios-nucleares\/#listItem","position":3,"name":"Nuclear Services","item":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/servicios-nucleares\/","nextItem":{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/servicios-nucleares\/operations-et-maintenance\/#listItem","name":"O&amp;M Support"},"previousItem":{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/#listItem","name":"Operative"}},{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/servicios-nucleares\/operations-et-maintenance\/#listItem","position":4,"name":"O&amp;M Support","item":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/servicios-nucleares\/operations-et-maintenance\/","nextItem":{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/#listItem","name":"Cleaning and decontamination work for the European Commission successfully completed"},"previousItem":{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/servicios-nucleares\/#listItem","name":"Nuclear Services"}},{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/#listItem","position":5,"name":"Cleaning and decontamination work for the European Commission successfully completed","previousItem":{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/servicios-nucleares\/operations-et-maintenance\/#listItem","name":"O&amp;M Support"}}]},{"@type":"Organization","@id":"https:\/\/gdes.com\/corporate\/en\/#organization","name":"GDES","description":"Grupo Dominguis Energy Services","url":"https:\/\/gdes.com\/corporate\/en\/","telephone":"+34963540300","logo":{"@type":"ImageObject","url":"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2016\/08\/cropped-GDES-1.png","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/#organizationLogo","width":115,"height":39},"image":{"@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/GDES_news","https:\/\/www.linkedin.com\/company\/gdes-grupo-dominguis-energy-services"]},{"@type":"Person","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/author\/comesp\/#author","url":"https:\/\/gdes.com\/corporate\/en\/blog\/author\/comesp\/","name":"Lucia Gomez"},{"@type":"WebPage","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/#webpage","url":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/","name":"Cleaning and decontamination work for the European Commission successfully completed - GDES Corporate","description":"The cleaning and decontamination work carried out for the European Commission at the Joint Research Centre (JRC) in Ispra, Italy, concluded in August with the delivery of the final report. According to Lainsa\u2019s Director for Europe and Asia, Jos\u00e9 Tom\u00e1s Ruiz Mart\u00ednez, \u201cthe objectives were all met, both in terms of quality and service efficiency,","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/gdes.com\/corporate\/en\/#website"},"breadcrumb":{"@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/#breadcrumblist"},"author":{"@id":"https:\/\/gdes.com\/corporate\/en\/blog\/author\/comesp\/#author"},"creator":{"@id":"https:\/\/gdes.com\/corporate\/en\/blog\/author\/comesp\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2019\/02\/ispra.jpg","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/#mainImage","width":200,"height":200},"primaryImageOfPage":{"@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/#mainImage"},"datePublished":"2012-10-11T12:04:12+01:00","dateModified":"2019-05-03T08:17:58+01:00"},{"@type":"WebSite","@id":"https:\/\/gdes.com\/corporate\/en\/#website","url":"https:\/\/gdes.com\/corporate\/en\/","name":"GDES Corporate","description":"Grupo Dominguis Energy Services","inLanguage":"en-US","publisher":{"@id":"https:\/\/gdes.com\/corporate\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"GDES Corporate - Grupo Dominguis Energy Services -","og:type":"article","og:title":"Cleaning and decontamination work for the European Commission successfully completed - GDES Corporate","og:description":"The cleaning and decontamination work carried out for the European Commission at the Joint Research Centre (JRC) in Ispra, Italy, concluded in August with the delivery of the final report. According to Lainsa\u2019s Director for Europe and Asia, Jos\u00e9 Tom\u00e1s Ruiz Mart\u00ednez, \u201cthe objectives were all met, both in terms of quality and service efficiency,","og:url":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/","og:image":"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2019\/02\/ispra.jpg","og:image:secure_url":"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2019\/02\/ispra.jpg","og:image:width":200,"og:image:height":200,"article:published_time":"2012-10-11T11:04:12+00:00","article:modified_time":"2019-05-03T07:17:58+00:00","twitter:card":"summary_large_image","twitter:site":"@GDES_news","twitter:title":"Cleaning and decontamination work for the European Commission successfully completed - GDES Corporate","twitter:description":"The cleaning and decontamination work carried out for the European Commission at the Joint Research Centre (JRC) in Ispra, Italy, concluded in August with the delivery of the final report. According to Lainsa\u2019s Director for Europe and Asia, Jos\u00e9 Tom\u00e1s Ruiz Mart\u00ednez, \u201cthe objectives were all met, both in terms of quality and service efficiency,","twitter:creator":"@GDES_news","twitter:image":"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2019\/02\/ispra.jpg"},"aioseo_meta_data":{"post_id":"4627","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2023-01-22 14:16:15","updated":"2025-06-04 12:42:32","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/gdes.com\/corporate\/en\" title=\"Inicio\">Inicio<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&rsaquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/\" title=\"Operative\">Operative<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&rsaquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/servicios-nucleares\/\" title=\"Nuclear Services\">Nuclear Services<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&rsaquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/servicios-nucleares\/operations-et-maintenance\/\" title=\"O&amp;M Support\">O&amp;M Support<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&rsaquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tCleaning and decontamination work for the European Commission successfully completed\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Inicio","link":"https:\/\/gdes.com\/corporate\/en"},{"label":"Operative","link":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/"},{"label":"Nuclear Services","link":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/servicios-nucleares\/"},{"label":"O&amp;M Support","link":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/operativa\/servicios-nucleares\/operations-et-maintenance\/"},{"label":"Cleaning and decontamination work for the European Commission successfully completed","link":"https:\/\/gdes.com\/corporate\/en\/blog\/2012\/10\/11\/concluyen-con-exito-los-trabajos-de-limpieza-y-descontaminacion-para-la-comision-europea\/"}],"_links":{"self":[{"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/4627","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/comments?post=4627"}],"version-history":[{"count":1,"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/4627\/revisions"}],"predecessor-version":[{"id":4629,"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/4627\/revisions\/4629"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/media\/4628"}],"wp:attachment":[{"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/media?parent=4627"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/categories?post=4627"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/tags?post=4627"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}