{"id":1104,"date":"2018-01-15T11:22:05","date_gmt":"2018-01-15T10:22:05","guid":{"rendered":"https:\/\/gdes.com\/gdes-es\/?p=1104"},"modified":"2021-01-14T07:39:05","modified_gmt":"2021-01-14T06:39:05","slug":"offgas","status":"publish","type":"post","link":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/","title":{"rendered":"NPP implementation of the Off-Gas continuous monitoring system"},"content":{"rendered":"<p><strong><a href=\"https:\/\/gdes.com\/innovation\/en\">GDES Technology For Services\u00a0<\/a>(GDES T4S) <\/strong>has successfully completed the project to implement a system for \u201creal-time monitoring and evaluation of the integrity of the reactor fuel and control rods, through continuous measurement of gases in the off-gas line\u201d at the <strong>Cofrentes NPP<\/strong> during its last refueling outage.<\/p>\n<p><!--more--><\/p>\n<p>Data on the integrity of the fuel and the control rods is of vital importance for safe operation of a nuclear power plant. This new system enables <strong>early detection of fuel failures<\/strong> and monitors their progress. Simultaneously, the system also <strong>monitors the integrity of the control rods<\/strong>. This technology delivers online fuel monitoring, significantly reducing operations time and lowering operating costs.<\/p>\n<p>The Off-Gas Continuous Monitoring System is the pioneer project of GDES T4S, a company resulting from the partnership between Iberdrola and GDES. <strong>The project was developed by a multidisciplinary team<\/strong>, whose members come from GDES R&amp;D, Radiological Protection and Information Systems departments, with <strong>direct support from staff at the Cofrentes Nuclear Power Plant<\/strong>.<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Espa\u00f1ol.<\/p>\n","protected":false},"author":3,"featured_media":1602,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[108],"class_list":["post-1104","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-gdes-innovation","tag-inno"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"GDES Technology For Services (GDES T4S) has successfully completed the project to implement a system for \u201creal-time monitoring and evaluation of the integrity of the reactor fuel and control rods, through continuous measurement of gases in the off-gas line\u201d at the Cofrentes NPP during its last refueling outage. Data on the integrity of the fuel and\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Lucia Gomez\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"GDES Corporate - Grupo Dominguis Energy Services -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"NPP implementation of the Off-Gas continuous monitoring system - GDES Corporate\" \/>\n\t\t<meta property=\"og:description\" content=\"GDES Technology For Services (GDES T4S) has successfully completed the project to implement a system for \u201creal-time monitoring and evaluation of the integrity of the reactor fuel and control rods, through continuous measurement of gases in the off-gas line\u201d at the Cofrentes NPP during its last refueling outage. Data on the integrity of the fuel and\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2017\/08\/OffGass-System2.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2017\/08\/OffGass-System2.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"847\" \/>\n\t\t<meta property=\"og:image:height\" content=\"260\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2018-01-15T10:22:05+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2021-01-14T06:39:05+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@GDES_news\" \/>\n\t\t<meta name=\"twitter:title\" content=\"NPP implementation of the Off-Gas continuous monitoring system - GDES Corporate\" \/>\n\t\t<meta name=\"twitter:description\" content=\"GDES Technology For Services (GDES T4S) has successfully completed the project to implement a system for \u201creal-time monitoring and evaluation of the integrity of the reactor fuel and control rods, through continuous measurement of gases in the off-gas line\u201d at the Cofrentes NPP during its last refueling outage. Data on the integrity of the fuel and\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@GDES_news\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2017\/08\/OffGass-System2.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2018\\\/01\\\/15\\\/offgas\\\/#blogposting\",\"name\":\"NPP implementation of the Off-Gas continuous monitoring system - GDES Corporate\",\"headline\":\"NPP implementation of the Off-Gas continuous monitoring system\",\"author\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/author\\\/comesp\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/wp-content\\\/uploads\\\/sites\\\/5\\\/2017\\\/08\\\/OffGass-System2.jpg\",\"width\":847,\"height\":260},\"datePublished\":\"2018-01-15T11:22:05+01:00\",\"dateModified\":\"2021-01-14T07:39:05+01:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2018\\\/01\\\/15\\\/offgas\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2018\\\/01\\\/15\\\/offgas\\\/#webpage\"},\"articleSection\":\"GDES Innovation, Innovation\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2018\\\/01\\\/15\\\/offgas\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en#listItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/category\\\/gdes-innovation\\\/#listItem\",\"name\":\"GDES Innovation\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/category\\\/gdes-innovation\\\/#listItem\",\"position\":2,\"name\":\"GDES Innovation\",\"item\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/category\\\/gdes-innovation\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2018\\\/01\\\/15\\\/offgas\\\/#listItem\",\"name\":\"NPP implementation of the Off-Gas continuous monitoring system\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en#listItem\",\"name\":\"Inicio\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2018\\\/01\\\/15\\\/offgas\\\/#listItem\",\"position\":3,\"name\":\"NPP implementation of the Off-Gas continuous monitoring system\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/category\\\/gdes-innovation\\\/#listItem\",\"name\":\"GDES Innovation\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/#organization\",\"name\":\"GDES\",\"description\":\"Grupo Dominguis Energy Services\",\"url\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/\",\"telephone\":\"+34963540300\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/wp-content\\\/uploads\\\/sites\\\/5\\\/2016\\\/08\\\/cropped-GDES-1.png\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2018\\\/01\\\/15\\\/offgas\\\/#organizationLogo\",\"width\":115,\"height\":39},\"image\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2018\\\/01\\\/15\\\/offgas\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/GDES_news\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/gdes-grupo-dominguis-energy-services\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/author\\\/comesp\\\/#author\",\"url\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/author\\\/comesp\\\/\",\"name\":\"Lucia Gomez\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2018\\\/01\\\/15\\\/offgas\\\/#webpage\",\"url\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2018\\\/01\\\/15\\\/offgas\\\/\",\"name\":\"NPP implementation of the Off-Gas continuous monitoring system - GDES Corporate\",\"description\":\"GDES Technology For Services (GDES T4S) has successfully completed the project to implement a system for \\u201creal-time monitoring and evaluation of the integrity of the reactor fuel and control rods, through continuous measurement of gases in the off-gas line\\u201d at the Cofrentes NPP during its last refueling outage. Data on the integrity of the fuel and\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2018\\\/01\\\/15\\\/offgas\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/author\\\/comesp\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/author\\\/comesp\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/wp-content\\\/uploads\\\/sites\\\/5\\\/2017\\\/08\\\/OffGass-System2.jpg\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2018\\\/01\\\/15\\\/offgas\\\/#mainImage\",\"width\":847,\"height\":260},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/blog\\\/2018\\\/01\\\/15\\\/offgas\\\/#mainImage\"},\"datePublished\":\"2018-01-15T11:22:05+01:00\",\"dateModified\":\"2021-01-14T07:39:05+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/\",\"name\":\"GDES Corporate\",\"description\":\"Grupo Dominguis Energy Services\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/gdes.com\\\/corporate\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"NPP implementation of the Off-Gas continuous monitoring system - GDES Corporate","description":"GDES Technology For Services (GDES T4S) has successfully completed the project to implement a system for \u201creal-time monitoring and evaluation of the integrity of the reactor fuel and control rods, through continuous measurement of gases in the off-gas line\u201d at the Cofrentes NPP during its last refueling outage. Data on the integrity of the fuel and","canonical_url":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/#blogposting","name":"NPP implementation of the Off-Gas continuous monitoring system - GDES Corporate","headline":"NPP implementation of the Off-Gas continuous monitoring system","author":{"@id":"https:\/\/gdes.com\/corporate\/en\/blog\/author\/comesp\/#author"},"publisher":{"@id":"https:\/\/gdes.com\/corporate\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2017\/08\/OffGass-System2.jpg","width":847,"height":260},"datePublished":"2018-01-15T11:22:05+01:00","dateModified":"2021-01-14T07:39:05+01:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/#webpage"},"isPartOf":{"@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/#webpage"},"articleSection":"GDES Innovation, Innovation"},{"@type":"BreadcrumbList","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en#listItem","position":1,"name":"Inicio","item":"https:\/\/gdes.com\/corporate\/en","nextItem":{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/gdes-innovation\/#listItem","name":"GDES Innovation"}},{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/gdes-innovation\/#listItem","position":2,"name":"GDES Innovation","item":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/gdes-innovation\/","nextItem":{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/#listItem","name":"NPP implementation of the Off-Gas continuous monitoring system"},"previousItem":{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en#listItem","name":"Inicio"}},{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/#listItem","position":3,"name":"NPP implementation of the Off-Gas continuous monitoring system","previousItem":{"@type":"ListItem","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/gdes-innovation\/#listItem","name":"GDES Innovation"}}]},{"@type":"Organization","@id":"https:\/\/gdes.com\/corporate\/en\/#organization","name":"GDES","description":"Grupo Dominguis Energy Services","url":"https:\/\/gdes.com\/corporate\/en\/","telephone":"+34963540300","logo":{"@type":"ImageObject","url":"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2016\/08\/cropped-GDES-1.png","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/#organizationLogo","width":115,"height":39},"image":{"@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/GDES_news","https:\/\/www.linkedin.com\/company\/gdes-grupo-dominguis-energy-services"]},{"@type":"Person","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/author\/comesp\/#author","url":"https:\/\/gdes.com\/corporate\/en\/blog\/author\/comesp\/","name":"Lucia Gomez"},{"@type":"WebPage","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/#webpage","url":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/","name":"NPP implementation of the Off-Gas continuous monitoring system - GDES Corporate","description":"GDES Technology For Services (GDES T4S) has successfully completed the project to implement a system for \u201creal-time monitoring and evaluation of the integrity of the reactor fuel and control rods, through continuous measurement of gases in the off-gas line\u201d at the Cofrentes NPP during its last refueling outage. Data on the integrity of the fuel and","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/gdes.com\/corporate\/en\/#website"},"breadcrumb":{"@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/#breadcrumblist"},"author":{"@id":"https:\/\/gdes.com\/corporate\/en\/blog\/author\/comesp\/#author"},"creator":{"@id":"https:\/\/gdes.com\/corporate\/en\/blog\/author\/comesp\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2017\/08\/OffGass-System2.jpg","@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/#mainImage","width":847,"height":260},"primaryImageOfPage":{"@id":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/#mainImage"},"datePublished":"2018-01-15T11:22:05+01:00","dateModified":"2021-01-14T07:39:05+01:00"},{"@type":"WebSite","@id":"https:\/\/gdes.com\/corporate\/en\/#website","url":"https:\/\/gdes.com\/corporate\/en\/","name":"GDES Corporate","description":"Grupo Dominguis Energy Services","inLanguage":"en-US","publisher":{"@id":"https:\/\/gdes.com\/corporate\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"GDES Corporate - Grupo Dominguis Energy Services -","og:type":"article","og:title":"NPP implementation of the Off-Gas continuous monitoring system - GDES Corporate","og:description":"GDES Technology For Services (GDES T4S) has successfully completed the project to implement a system for \u201creal-time monitoring and evaluation of the integrity of the reactor fuel and control rods, through continuous measurement of gases in the off-gas line\u201d at the Cofrentes NPP during its last refueling outage. Data on the integrity of the fuel and","og:url":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/","og:image":"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2017\/08\/OffGass-System2.jpg","og:image:secure_url":"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2017\/08\/OffGass-System2.jpg","og:image:width":847,"og:image:height":260,"article:published_time":"2018-01-15T10:22:05+00:00","article:modified_time":"2021-01-14T06:39:05+00:00","twitter:card":"summary_large_image","twitter:site":"@GDES_news","twitter:title":"NPP implementation of the Off-Gas continuous monitoring system - GDES Corporate","twitter:description":"GDES Technology For Services (GDES T4S) has successfully completed the project to implement a system for \u201creal-time monitoring and evaluation of the integrity of the reactor fuel and control rods, through continuous measurement of gases in the off-gas line\u201d at the Cofrentes NPP during its last refueling outage. Data on the integrity of the fuel and","twitter:creator":"@GDES_news","twitter:image":"https:\/\/gdes.com\/corporate\/wp-content\/uploads\/sites\/5\/2017\/08\/OffGass-System2.jpg"},"aioseo_meta_data":{"post_id":"1104","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2023-01-22 14:21:33","updated":"2025-06-04 12:49:20","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/gdes.com\/corporate\/en\" title=\"Inicio\">Inicio<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&rsaquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/gdes.com\/corporate\/en\/blog\/category\/gdes-innovation\/\" title=\"GDES Innovation\">GDES Innovation<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&rsaquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tNPP implementation of the Off-Gas continuous monitoring system\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Inicio","link":"https:\/\/gdes.com\/corporate\/en"},{"label":"GDES Innovation","link":"https:\/\/gdes.com\/corporate\/en\/blog\/category\/gdes-innovation\/"},{"label":"NPP implementation of the Off-Gas continuous monitoring system","link":"https:\/\/gdes.com\/corporate\/en\/blog\/2018\/01\/15\/offgas\/"}],"_links":{"self":[{"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/1104","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/comments?post=1104"}],"version-history":[{"count":10,"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/1104\/revisions"}],"predecessor-version":[{"id":4407,"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/posts\/1104\/revisions\/4407"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/media\/1602"}],"wp:attachment":[{"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/media?parent=1104"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/categories?post=1104"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gdes.com\/corporate\/en\/wp-json\/wp\/v2\/tags?post=1104"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}